Define The Electricity Service Fees of Freeze And Freezer Container

Type

Price

20′ Container truck $1.67/hour
40’/45′ Container truck $3.33/hour

Remark

  • The electricity service fees of reefer container are exclusive of VAT 10%.
  • The charge of electricity use for the reefer container will be calculated hourly.
  • The storage charge of the container is base on the tariff of PPAP.

Weight Station all type of vehicles

Type

Price

Remark

20 Container truck $3 / per time All the cost above are exclusive of VAT 10%
40’/45′ Container truck $5 / per time
For General Cargoes $0.5 / ton

Phnom Penh Autonornous Port “PPAP” would like to inform all valued customers that PPAP will implement the new Gate Fee structure from the 1st of February 2015 onward as following:

Truck Type

Gate Fee

Container Truck Carrying

20’Container(empty or laden)
40’/45’Container(empty or laden)

$3/time
$5/time

General Cargo Truck

1 Ton to 6 Tons
more than 6 Tons

$2/time
$3/time

Remark

  • The gate fee is charged once upon entry (if the truck is carrying container or cargo) and once more upon exit (if the truck is carrying container or cargo). In contrast, if the truck is not carrying container or cargo then gate fee will not be charged ( Ex: If a truck is entering the port carrying a 20′ container for export and is not carrying any container when exiting the port then the truck is only charged $ 5 once for entry).
  • A truck carrying two 20′ containers is charged $6 (2 of 20’containers x $3).
  • The tariff above is exclusive of VAT 10%.
  • Gate fee is exempted for trucks carrying paddy or rice for export, whereby, all relevant documents must be shown at the gate upon entry.
  • Note: Container trucks and general cargo trucks are not allowed to park idly inside the port area longer than 6 hours.

1. Navigation Charges

$0.13 x GRT x 2 (for each Entry/Departure)

2. Berthage Charges

A – For cargoes vessels below 2 days:
a: At quay $0.23 x GRT
b: At buoy $0.10 x GRT
c: At anchorage $0.05 x GRT
B – For tourist and service vessels:
a: At quay $0.003 x GRT x hrs
b: At buoy $0.001 x GRT x hrs
c: At anchorage $0.0005 x GRT x hrs

For cargo vessels discharge or loading over 5 days, the first period is to be applied in point A. And over this period of alongside to surplus in point B. In case of receiving of harbor sailing. Order but still occupying a berth the vessels shall be fined as follow :
a:    At quay $0.70/meter /hrs
b:    At buoy $50.00/hrs

3. CHANNEL DUES

For commercial vessel: $0.31 x GRT x 2
For lighter carrier: $0.16 x GRT

4. PILOTAGE CHARGE

For each Entry/Departure (Minimum charges $100.00)
a: $0.003 x GRT x 9 miles (for commercial seaport)
b: $0.03 x GRT (for refinery port)
c: $0.017 x GRT (for each shifting)

5. TUG ASSISTANCE CHARGES UP TO REGISTER TONNAGE OF VESSEL

Type of Vessels

Tug Assistance Charge: USD/ hrs

Vessel below 1.000GRT $83.00
From 1.001 to 4.000 $149.00
From 4.001 to 10.000 $165.50
From 10.001 to 15.000 $215.00
Above 15.000 GRT every subsequent of 1.000 GRT to be charged in addition to $18.00

6. MOORING & UNMOORING UP TO GRT OF THE VESSEL

Type of Vessels

Mooring and Unmooring

At Quay At Buoy
GRT bellow 1.000 $16.50 $50.00
From 1.001 to 4.000 $33.00 $83.00
From 4.000 to 10.000 $50.00 $110.00
From 10.001 to 15.000 $66.00 $132.00
Above 15.001 $83.00 $149.00

7. CHARGE FOR OPENING & CLOSING HATCHES

Type of Vessels

Tariff for Each Opening or Closing

Hatch without Beam Hatch with Beam
Below 5.000 GRT $13.00 $26.00
From 5.001 to 10.000 $32.00 $46.00
Above 10.001 $36.00 $73.00

8. CHARGE FOR CLEANING AND SWEEPING HATCHES

Type of Vessels by GRT

Innocuous – Cargo

Dangerous & Poisonous Cargo

Below 5000 GRT $33.00 $53.00
From 5001 to 10.000 $41.00 $83.00
Above 10.001 $56.00 $116.00

CHARGES FOR SWEEPING AND WASHING SHIP’S DECKS
A. with water supply by ship: $0.17 / m2
B. with water supply by port: $0.20 / m2

9. CHARGES FOR DUMPING SERVICE

(GARBAGE REMOVAL CHANGES)
A. At quay $2.50 / times
B. At buoy $3.75 / times

10. FRESHWATER CHARGES

A. Supplied from a hydrant at quay $2.50 / m2
B. Supplied by truck $3.75 / m2

11. OTHER CHARGES

A. Clearance fee $100.00 / vessel
B. Watchman $1.60/ person /hrs

CONTAINER HANDLING CHARGES

1 – Stevedoring Charge:

Quay-CY, CY-Quay

20′ 40′,  45′
Laden $49.00/Unit $74.00/Unit
Empty $26.00/Unit $37.00/Unit

Crane Charge

20′ 40′,  45′
Laden $16.00/Unit $25.00/Unit
Empty $10.00/Unit $16.00/Unit

2 – Lift-on/Lift-off (CY-Truck or Truck-CY)

Container (Import or Export)

20′ 40′

Laden

$45 $67

Empty

$23 $34

Tally Fee:

The tariff above is inclusive of $1.00 tally fee for both import and export containers.

3 – STUFFING OR UNSTUFFING OF Container

20′ 40′,  45′
$50.00/Unit $100.00/Unit

4 – STORAGE CHARGE

– For import cargoes: 7days free of charge after completion of discharging from a vessel.
– For export cargoes: 7days free of charge from the moment the cargoes come to store yard.

20′ 40′,  45′
Laden $3.00/Unit $6.00/Unit
Empty $1.20/Unit $2.00/Unit

5 – THE GOVERNMENT INCOME TAX

– All the cost presented above are not included VAT 10%
– All taxes will be carried out in accordance with the law of the Royal Government of Cambodia.

*Remark

– Phnom Penh Autonomous Port Collect Lo/Lo Container One way only.
– The following rates have been offered to any shipping Lines according to their quantity in TEUs provided through PPAP.

Container From 3001TEUS – 7000TEUS From 7001TEUS – 12000TEUS From 12001TEUS – 17000TEUS From 17001TEUS Up
LADEN20’ $46.00 $44.00 $41.00 $39.00
EMPTY20’ $24.00 $23.00 $22.00 $20.00
LADEN40’ $70.00 $66.00 $62.00 $59.00
EMPTY40’ $35.00 $33.00 $31.00 $29.00